Municipal & Community · Recently Completed Project

Mayim Aquatic Centre

PROJECT DESCRIPTION

G architects is serving as the lead architectural consultant for the redevelopment and pool addition at Kayla’s Children Centre in Vaughan, Ontario. The project introduces a purpose-built natatorium designed to enhance therapeutic programming, recreation, and wellness opportunities for children and youth with special needs.

The 7,500-square-foot addition features a double-height pool hall enclosing a 30’ × 60’ therapeutic pool with both ramped and stepped entry, ensuring universal accessibility. A new single-storey wing integrates supporting change rooms, washrooms, and service spaces, while a 1,500-square-foot basement accommodates mechanical and pool equipment. Together, these new facilities complement Kayla’s existing building and expand the organization’s ability to deliver inclusive aquatic therapy, life skills programs, and community recreation.

Developed in collaboration with Acapulco Pools as Design Builder, the project advances Kayla’s mission to create safe, adaptive, and joyful environments that support growth and belonging. With a focus on accessibility and sensory comfort, the design incorporates warm, daylight-filled interiors, acoustic treatment, and efficient air handling systems that promote well-being for users and staff alike.

CLIENT

Organization

VALUE

$5M

YEAR COMPLETE

2022

SCOPE

Full Architectural Services for Pool Addition

Design of Therapeutic and Accessible Aquatic Facilities

Design for Sensory Comfort and Universal Accessibility

SIZE

~9,000sq. ft.

PROJECT SCOPE

G architects is responsible for leading all architectural and coordination services from project initiation through construction completion, including:

  • Design development and documentation for the new pool addition and associated renovations to the existing facility

  • Coordination of structural, mechanical, electrical, civil, and landscape disciplines

  • Preparation and submission of Site Plan and Building Permit applications on behalf of the client

  • Design review, cost coordination, and value-engineering support in collaboration with the Design Builder

  • Construction Contract Administration, including biweekly site meetings, review of shop drawings and RFIs, and support for Substantial Completion and project close-out

CHALLENGES AND ACCOMPLISHMENTS

A key challenge of the project was integrating a complex, double-height natatorium within the constraints of the existing site and building, ensuring seamless functional and aesthetic continuity. G architects worked closely with the client, design builder, and consultant team to align technical requirements—such as structural spans, HVAC and dehumidification systems, and water treatment—with the architectural vision for a calm, therapeutic environment.

Another challenge involved balancing municipal approvals and construction timelines to meet the goal of opening the facility by Fall 2019. Through proactive coordination and clear communication with the City of Vaughan, G architects successfully advanced the project through Site Plan and Building Permit stages, maintaining schedule alignment and design integrity.

The Kayla’s Children Centre Natatorium stands as an accomplishment in inclusive community design, expanding the organization’s capacity to deliver accessible aquatic therapy and recreation. The new pool addition reinforces Kayla’s role as a leader in special needs programming, creating an uplifting space that celebrates participation, progress, and care.

Previous
Previous

Gander and Grand Falls-Windsor Homes

Next
Next

North York General Hospital Outpatient Services Centre